null null

PLANNED


COMPLETED

Now that we have finished the renovations, we can concentrate on the "little things" that get identified as time goes on. So, please send us your "wish list" of things we may have missed.


The following are planned or in progress. This is Mexico, so we can only estimate when the improvements will be ready.

  • Install private transformer and use the generator for electrical backup for Casa Delfín and the entire Romero Complex.
  • More flowers and improved landscaping to replace those neglected over time and damaged by Dean.
  • Improved WiFi connectivity and speed.
  • Hot tub for Casa Romero.
  • Expanded storage rooms and possible garage between the two casitas.
  • Replce and expand the Romero "Pink Bedroom" bathroom over part of the terrace.




July - December 2007
ROMERO COMPLEX:
Totally unreasonable expectations, but we did it! Added all ceilings, floors, tiles, electrical, plumbing, to the three shell townhouses, completely remodeled and upgraded Casa Romero including completely new kitchen and downstairs bath. New roof tiles throughout the entire complex. Totally redecorated every room with all new furniture, beds, appliances, bedding, dishes, flatware, and artwork throughout. Added four rooftop pools, concrete covers for shaded rooftop areas on all townhouses. At Casa Romero, designed and built both the pool and the tower balcony.
CASA DELFÍN
Moved generator to new separate building, installed private transformer.

January - June 2007
CASA DELFÍN
Take care of the cooks! Added air conditioner, new appliances, ice maker and new cabinetry for the kitchen.
Added room to Casita.
ROMERO COMPLEX:
Acquired the Romero complex and started plans for restoration.

July - December 2006
CASA DELFÍN
Lagoon entrance: built wide wooden steps to the lagoon and added the palapa.

January - June 2006
CASA DELFÍN
Installed heated rooftop pool. Replaced all older furniture including living room. Added rocking chairs on veranda. New china and china cabinet, new flatware. Replaced all roof tiles. Full house generator installed.

October - December 2005
CASA DELFÍN
Large screen TV with satellite (US content) and DVD. Install AC in all bedrooms. Redecorate existing 4 bedrooms. New artwork and decorations throughout. Repaired septic system and built wetlands. Added DSL with unlimited WiFi internet connection and VOIP. New bicycles. New dining room table, additional dining chairs, new glassware. Complete installation of new bedroom with enlarged bathroom/shower. Installed new windows in all bedrooms/bathrooms.

June - August 2005
CASA DELFÍN
Elmily repairs required: replace roof Palapa, start other repairs. Upgraded electrical service. Built new garage with storage rooms. Built new bathroom and converted storage room into fifth bedroom, moved laundry into "downstairs kitchen" area.